Date Posted : March 9, 2023


We are installing just over 2 kms worth of sewer main and 2 kms of watermain along with complete services and catch basins for both water and sewer. Pipes being installed range from 250 mm to 750 mm in diameter.


Sewer separation and watermain replacement project in New Westminster


  • Completion Date: January 2024
  • Start Date: February 2023
  • Client: City of New Westminster

New Westminster being the province's first incorporated city in 1860, this area has quite old utility infrastructure and we came across a few unknown variables in the ground, such as running through a creek bed, and we've been addressing those discoveries with environmentally sustainable solutions as we moved forward at a steady pace. Original completion date was end of March 2023, but we were able to have it wrapped up 2 weeks ahead of schedule.

Some key technical specs of this project include the supply and installation of approximately:

  • 1400 m of PVC storm sewer of various sizes from 250 mm – 525 mm on Thirteenth Street between Tenth Avenue and Fourth Avenue.
  • 160 m of PVC storm sewer of various sizes from 525 mm – 750 mm on Fourth Avenue between Thirteenth Street and Fourteenth Street.
  • 1100 m of 200 mm DI watermain on Thirteenth Street between Tenth Avenue and Fourth Avenue, excluding the portion between Sixth Avenue and Fifth Avenue
  • 225 m of PVC storm sewer of various sizes from 250 mm – 450 mm on Sixth Avenue between Thirteenth Street and Fourteenth Street.
  • 1300 m of 200 mm DI watermain on Sixth Avenue between Tenth Street and Twentieth Street.
  • 1200 m of PVC storm sewer of various sizes from 250 mm – 600 mm on Sixth Avenue between Fourteenth Street and Twentieth Street.