Date Posted : June 2, 2023


This New Westminster electrical project involves the installation of an electrical duct bank along Rousseau St, crossing the Braid St intersection.


  • Completion Date: September 2023
  • Start Date: July 2023
  • Client: City of New Westminster

Approximately 130m of 12-125mm concrete-encased DB2 conduit, 20m of 16-125mm concrete-encased DB2 conduit, and 50m of 4-125mm concrete-encased DB2 conduit is to be installed.

This site also contains a number of existing underground utility lines which must be crossed during the installation of these duct banks, adding to the complexity of the project.

After the duct bank installation, final road restoration will take place, including milling and final overlay of asphalt.